CV / RESUME

MATT  HAYLLAR

 

62 Brodie Drive

Elgin

IV30 4LW

Home:01343 552619

Mobile:+447540809969

 

Personal Profile

 

Since joining the Oil and Gas industry in 2003 I have been engaged in various projects within the North Sea and latterly in various locations abroad. Previous to the set up of my company I have worked as a Service Leader for Halliburton and for EnerMech as PPU SNR Project Engineer.  I have been responsible for the delivery, planning, resourcing and execution of projects within various regions. My area of expertise is N2/He Leak Testing and Pre-commissioning services.  I am also competent in N2 leak testing, strength testing, flange weld testing, Bolt Tensioning/Torquing (Hydraulic and Manual), Pipe freezing, Hydro testing, N2 Purging, Flushing and Camera Inspection.

I can create and review PPS / PPU procedures specialising in Helium Leak Detection and also have been involved in various Commissioning activities such as defining system/sub system mark ups and providing registers for PSV recertification for our clients.  I am 31 years old and have been married to my wife Claire for 10 years.  I am very much a family man and we have three children Shannon ,Ben and Kieran which mean everything to me. I enjoy holidays / days out with my family and my hobbies include Football golf and cycling. I am a passionate supporter of my local football team Elgin City and attend games whenever I can.

 

Personal Details

 

Date of Birth: 06/11/1982

Marital Status: Married

Driving Licence: Full UK (Clean)

Email Address:matthew_hayllar@yahoo.com

 

Core Skills

 

  • Strong technical PPU and PPS background with valuable transferable skills.

  • Energetic and highly motivated team player.

  • Enjoy training and mentoring of others

  • Excellent organisational skills

  • Competent in reading and understanding all types of engineering drawings.

  • Fast learner.

  • Excellent people skills.

  • Innovative problem solving and decision making.

  • Exceptional time management.

  • Self-disciplined.

  • Good verbal and written communication skills.

  • Good computer skills including EnerMech engineering software SIM , Bluebeam Word & Excel

 

Qualifications and Training

 

Minimum Industry Safety Training (MIST) for Experienced Offshore Workers

Fire Evacuation

10 Year US B1/B2 Work Permit

Azerbaijan Visa 

PAN European RGIT including Norwegian and Dutch sectors

5-Day Fire Team Member Certificate(Expires July 2015)

Full Expat offshore medical including drug screen and blood tests(Expires September 2016)

HOC Halliburton Observation Card Training

 

C&G Level 2 Cert in Petroleum Processing Technology-

 

•           Piping & Instrument Drawings / Isometric Drawings

•           Produced water treatment

•           Water Injection

•           Oil and Gas Separation

•           Gas Dehydration - Currently ongoing

 

Confined Space Entry

Pressure Safety Awareness Training

Hoisting and Rigging

Lockout / Tagout

Threaded Connections

Radiation General Awareness

Radio Frequency and Emission and Well site Safety Awareness

Nitrogen Pumping / Nitrogen Handling – PSL

Coiled Tubing – PSL

Basic Wireline – PSL

QHSE Field – PSL

Pipelines Training – PSL

Fluid Pumping – PSL

Treating Iron and Fittings – PSL

Leak Testing – PSL

Bolt Torquing & Tensioning – PSL

Introduction to the Diesel Engine – PSL

Introduction to Basic Hydraulics – PSL

Hazard Communication

Pressure and Leak Testing

Combined Nitrogen and Fluid Pumping

Pipe Freeze Training

Introduction to Basic Hydraulics

Introduction to Diesel Engine

Assembling and Tightening of Bolted Connections

 

Current Position

 

Director – Matt-Tech  Global Solutions – October 2014

 

Director of my own LTD company seeking new opportunities in the contract market for Pre-Commissioning and Commissioning services to the energy industry  

 

Recent Project Experience

 

GDF CYGNES PROJECT

 

Contracted to PNS (UK) Hydrotest Supervisor – BI Fab Yard , Methil , Fife

 

October 2014 – Present

 

Leading a team of Hydro test techs to meet schedules set by our client BIfab on the safe delivery of the Accommodation module for the GDF Cygnes project. 

 

BP AZERI T.A.R's

 

Contracted to Halliburton Service Leader / Project Manager – PSL/Halliburton –Azerbaijan -  Baku  

 

September 2014- October 2014

 

Working closely with the Baku PSL/Halliburton base to deliver the safe execution of projects

Support and provide technical advice to clients and PSL/Halliburton employees

Help to train local personnel to a high standard 

 

 

Hebron Project

 

EnerMech

 

Senior Project Engineer/EnerMech Rep in client office - Houston , Texas

 

January 2014 – August 2014

 

Responsible for the planning and creation of N2/Helium Leak Test packs and Gross Air Leak Test packs for the largest GBS structure in the North Atlantic

Supervision of a Snr work pack Engineer in the client offices

Providing the client with any advice and assistance as required

 

 

Jasmine Project 

 

EnerMech

 

Senior Project Engineer/EnerMech Rep ExxonMobil locations globally

 

September 2011 – December 2013

 

EnerMech Process and Pipelines Jasmine Project Cadiz, Spain and Ravenna, Italy

 

I was involved with the Jasmine project for over 2 years from Judy Brownfield modifications stage to Greenfield Onshore construction and commissioning activities onsite in both Ravenna and Cadiz yards and support for Offshore HUC. I was a direct supervisor for a team of 65 people over five Offshore assets including four onshore Project Engineers and One Logistics person.

 

My daily duties were to provide support for the Hook up and Commissioning phase included

 

  • Liaising with the client reps from Commissioning / ConocoPhillips to check and prioritise requirements for Equipment personnel and planning of works

  • Daily Interface meetings with Construction/Construction/Contracts personnel

  • Dealing with Engineering queries , Equipment and personnel requests from EnerMech Offshore Coordinators

  • Promoting EnerMech’s other service lines

  • Planning and recruitment of contract personnel

  • Monitoring ROTA for change and finding solutions to Personnel and Equipment shortfalls

  • Creation of Mobilisation lists and Interfacing with yard staff

  • Sourcing any Equipment for the Client and setting up PO’s

  • Generating Quotations for Adhoc scopes of work

  • Support all of EnerMech service lines predominantly Leak Test and Controlled Bolting of Jasmine Wellhead Platform and Judy Riser platforms as per contract in an onshore capacity.

 

Summary of recent Offshore Experiences

 

Judy Platform

 

EnerMech

 

Pre Hook Up commissioning Leak Test Campaign

 

August 2011 – September 2011  

 

Supervising a team of Four Supervisors and Ten Technicians to carried out pre-commissioning work including ;

 

  • Methanol tie in work

  • Jaws pipe work tie in

  • ILS and Diesel tie ins

  • Brownfield construction assistance 

  • Controlled Bolting and Flange Management

  • Various machining Scopes

 

Judy platform

 

EnerMech

 

Zinc Oxide Bed Change out

 

August 2011

 

  • Onshore planning of Purge , Leak test and controlled Bolting

  • Offshore Team leader for planning and execution of catalyst / media change out of Zinc Oxide Filter beds .

  • Successful Leak test of Zinc Oxide filters

 

 

Judy Platform

 

EnerMech

 

August 2011

 

2nd Zinc Oxide filter modification

 

  • Onshore “mock up” of planned 2nd Zinc Oxide Filter- Liaised with onshore with R&M Huntly and Amec E&C group.

  • Team Leader for installing and Leak Test of 2nd Zinc Oxide filter

 

Global Producer 3 (GP3)

 

Halliburton

 

Project Engineer/Focal Point Shutdown.

 

Jan 2010 – August 2011

 

 

  • Assist with Tender and E Auction

  • Onshore Leak test pack creation through Halliburton specialist software

  • Regular client meetings with process Engineer to accommodate changes to plan/scope

  • Mobilise to conduct Site survey

  • Creation of Mob list for complete scope of works

  • Full Offshore execution and engineering support for N2 Supervisors throughout Purge and Leak Test

  • Equipment demobilisation and Job close out

 

 

Balmoral FPV

 

Halliburton

 

Project Engineer/Focal Point for K-KB03 Compressor

Leak Test.

 

October 2009 – Jan 2010

 

  • Team Leader for Compressor Leak Test after rebuild

  •  Purge/Pressure build up on compressor to assist with start up

  • Successful Leak test  

 

Balmoral FPV

 

Halliburton

 

Project Engineer/Focal Point for Shutdown

 

August 2009 – October 2009

 

 

  • Assist with Tender and E Auction

  • Offshore Leak test pack creation through Halliburton specialist software

  • Regular client meetings with process Engineer to accommodate changes to plan/scope

  • Mobilise to conduct Site survey

  • Creation of Mob list for complete scope of works

  • Full Offshore execution an

  • Engineering support for N2 Supervisors throughout Purge and Leak Test

  • Equipment demobilisation and Job close out

 

 

Janice FPSO

 

Maersk

 

Halliburton

 

Project Engineer/Focal Point for Compressor “C” Leak Test campaign

 

Feb 2008 – October 2009

 

  • Onshore creation of procedures

  • Purge phase

  • Controlled bolting phase

  • Hot oil Flushing

  • Successful Leak Test

 

F3/FA Platform-Holland

 

Centrica

 

Halliburton

 

Dayshift Supervisor for P/Form Leak Test/Dewater

 

Feb 2008

 

 

  • Supervision of  a team of Pipeline personnel during Barrier test and Dewatering project

  • Rig up / Down of pipeline equipment

 

 

Aoka Mizu

 

UK (Offshore)      Bluewater

 

Halliburton

 

Project Engineer/Focal Point for Compressor A Leak Test

 

Jan 2008

 

  • Onshore creation of procedures

  • Purge phase

  • Successful Leak Test

 

 

Alba North

 

Halliburton

 

Chevron

 

Nightshift Supervisor for T.A.R

 

September 2007 – Jan 2008   

 

  • Planned all works onshore including company procedures

  • In order to train up and coming dayshift supervisor I assumed a Nightshift role to support the project

  • Successful Leak test , Controlled Bolting and Flange Management

 

Gryphon

 

UK (Offshore)      Maersk

 

Halliburton

 

Dayshift Leak Test Supervisor for Shutdown

 

July 2007 – September 2007

 

  • Assist with Tender and E Auction

  • Offshore Leak test pack creation through Halliburton specialist software

  • Regular client meetings with process Engineer to accommodate changes to plan/scope

  • Mobilise to conduct Site survey

  • Creation of Mob list for complete scope of works

  • Full Offshore execution and engineering support for N2 Supervisors throughout Purge and Leak Test

  • Equipment demobilisation and Job close out

 

 

Captain WPP

 

UK (Offshore)     

 

Chevron

 

Halliburton

 

Project Engineer/Focal Point for TAR/ Shutdown

 

July 2007

 

  • Offshore Leak test pack creation through Halliburton specialist software

  • Regular client meetings with process Engineer to accommodate changes to plan/scope

  • Mobilise to conduct Site survey

  • Creation of Mob list for complete scope of works

  • Full Offshore execution and engineering support for N2 Supervisors throughout Purge and Leak Test

  • Equipment demobilisation and Job close out

 

Janice

 

Maersk

 

Halliburton

 

Project Engineer/Focal Point for 2011 TAR/

Bluewater

 

 

  • Offshore Leak test pack creation through Halliburton specialist software

  • Regular client meetings with process Engineer to accommodate changes to plan/scope

  • Mobilise to conduct Site survey

  • Creation of Mob list for complete scope of works

  • Full Offshore execution and engineering support for N2 Supervisors throughout Purge and Leak Test

  • Equipment demobilisation and Job close out

 

 

Aoka Mizu

 

Halliburton

 

Project Engineer/Focal Point for  TAR/ Shutdown

 

April 2007

 

UK (Offshore)

 

  • Assist with Tender and E Auction

  • Offshore Leak test pack creation through Halliburton specialist software

  • Regular client meetings with process Engineer to accommodate changes to plan/scope

  • Mobilise to conduct Site survey

  • Creation of Mob list for complete scope of works

  • Full Offshore execution and engineering support for N2 Supervisors throughout Purge and Leak Test equipment demobilisation and Job close out

 

 

 

 

 

 